Wardlaw Wood Wind Farm


(Dalry Community Wind Farm)

Located within the Dalry Hills, Wardlaw Wood Wind Farm is situated 2¾ miles (4.5 km) northwest of Dalry in North Ayrshire. Six Vestas V90 turbines are arranged over the western slopes of Baidland Hill, each generating 3 megawatts (MW) of power, giving a total generation capacity for the site of 18 MW. Also known as Dalry Community Wind Farm, this was one of the first wind farms in the UK to use large 3 MW turbines, each with a blade diameter of 90m (295 feet). Each turbine is mounted on a 80-m (262-foot) high tower, giving a total height to blade tip of 125m (410 feet), secured on a reinforced concrete foundation. The farm was commissioned in 2006 and is operated by Bristol-based Wind Prospect. It was designed and built by contractors R.J. McLeod, who were also responsible for the construction of an electrical control building, together with 2 miles (3 km) of access roads using locally-extracted rock as hardcore. The farm provides significant financial benefit to a range of local community-based projects.

Kelburn Wind Farm lies immediately to the northwest and Millour Hill Wind Farm to the east.


Use the tabs on the right of this page to see other parts of this entry arrow

If you have found this information useful please consider making
a donation to help maintain and improve this resource. More info...

By using our site you agree to accept cookies, which help us serve you better