Mark Hill Wind Farm

Mark Hill Wind Farm occupies 580-ha / 1433-acre site on the southeastern slopes of the Garleffin Hill, to the southeast of the Muck Water, in South Ayrshire, 2 miles (3 km) northeast of Barrhill. Formally commissioned by First Minister, Alex Salmond, on 13th June 2011, the site comprises 28 Gamesa G87/2000 turbines, each 110m (361 feet) in height to blade tip, with a rotor diameter of 87m (285 feet) and generating 2 MW, giving a total output for the site of 56 MW. The wind farm is owned and operated by Scottish Power Renewables, part of the multi-national Iberdrola group. The facility was developed by Force 9 Energy and built by HBS Construction of Ballieston, who were responsible for the clearance of semi-mature commercial forest, the construction of around 10 miles (16 km) of new access roads, installation of turbine bases, a control building and electrical infrastructure.

A community fund has been established providing in the order of £80,000 per annum for local projects. Already a new heating system has been installed in the village hall in Barrhill and local residents have benefited from home insulation.


Use the tabs on the right of this page to see other parts of this entry arrow

If you have found this information useful please consider making
a donation to help maintain and improve this resource. More info...

By using our site you agree to accept cookies, which help us serve you better