Boyndie Wind Farm


(Boyndie Airfield Wind Farm)

Located on the site of the former RAF Banff in Aberdeenshire, Boyndie Wind Farm is located 1½ miles (2.5 km) west of Boyndie and 2 miles (3 km) southeast of Portsoy. The farm was commissioned in 2006 at a cost of £15 million. It comprises seven Enercon E70 turbines, with a blade diameter of 70m (230 feet) and hub height of 65m (213 feet) giving a height to blade-tip of 100m (328 feet). Each delivers 2 MW of power. The farm was extended in 2010 by adding a single 2.3 MW turbine, with a height to blade-tip of 113m (370 feet),.giving a total output for the farm of 16.3 MW. The wind turbines start generating electricity at wind speeds of about 3 m/s and generate their maximum output at 13 m/s. but will continue to generate safely at wind speeds of up to 28 m/s.

The developer was West Coast Energy for Falck Renewables, which owns and operates the farm and turns over a proportion of the annual profits for a community fund. The local Boyndie Wind Farm Co-op bought a minority stake in the farm soon after it was built. The Copenhagen-based investment fund PensionDanmark took a 49% share in this wind farm in 2014.


Use the tabs on the right of this page to see other parts of this entry arrow

If you have found this information useful please consider making
a donation to help maintain and improve this resource. More info...

By using our site you agree to accept cookies, which help us serve you better